01 Start of construction Sat, 25 Jan 2003_1
|
02 Initial Access to Property_1
|
03 Dina Checking out Site on Sat the 25th of Jan_1
|
04View of left side of Old Seawall with toppled Barriers_1
|
05View of Middle of Old Seawall and Groin_1
|
06Right Side of Seawall and Groin_1
|
07Looking up Access Road at rear of Cat Backhoe_1
|
08Right Corner of Seawall and Groins_1
|
09Overview of entire Old Seawall_1
|
10Details of Right Corner of Old Seawall_1
|
11Overview of old Seawall from Cliff_1
|
12Details of Left Corner Old Seawall and Stone_1
|
13 View of Pax River Naval Air Station_1
|
14Kenster Shoreling Garry Burgess Surveying Site_1
|
15Surveying depth of Stone Revetment Key Foundation_1
|
16 Trench Three Foot Deep for Stone Base_1
|
17 Checking Trench Depth_1
|
18Trench Depth at Access Road_1
|
19 Zee Bars, Used in Pairs to lock Jersey Barriers_1
|
20 View of Both Cat Backhow's Working Stone_1
|
21Two Cats Staging Stone_1
|
22Cat in far Corner Laying Stone_1
|
23 Cat Picking up Stone_1
|
24 Two Cats Staging Stone_1
|
25 Two Cat Backhoe's Working Together_1
|
26 Two Cats Moving Stone_1
|
27 Initial Twelve Foot Stone Pile_1
|
28 Two Cats Moving Stone to End_1
|
29 From Water, Watching Cats Move Stone_1
|
30 From Water Cat Stageing Stone in front of Access_1
|
31 Cat Placing Stone_1
|
32 Cat Nudging Stone_1
|
33 Cat Placing Stone Together_1
|
34 Cat Placing Stone_1
|
35Cat working along Jersey Barrier_1
|
36 Key Foundation to Stone Revetment being laid_1
|
37Stone Revetment Filter Cloth, Bedding Stone and Key Stone_1
|
38 Stone in Three foot Trench_1
|
39 Three Layers of Base Stone_1
|
40Laying Stone Revetment Layers_1
|
41 Laying Stone Along upper Terrace_1
|
42 Nudging Stone in Place to Surveyed String Line_1
|
43 Laying Top Layer of Stone_1
|
44 Laying Stone_1
|
45 DrumPt Swans_1
|